The mix is ready. Is it enough for the powder order and for the granulate that still has to be bagged today?
The answer depends on how much is already reserved, which route the mix can take through the plant and when the extruder needs it. In OPDPRO.CARE the intelligent digital twin brings this knowledge together at the batch. Production planning sees the material demand, the operator the next order and production management the impact on both delivery dates.
How it all connects
- Event in the value stream
At the dryblend silo the free stock is not enough for the next order.
- Digital twin
Connects batch, silo, reservations and both orders.
- AI models
Calculate the shortfall, estimate times, compare options.
- Agent
Prepares the decision and involves the right roles.
- Role decides
Production planning and production management approve.
- Back into production
The operator executes. Actual quantity and handover flow back into the value stream.
One value stream, several possible products
Click a connection: source, target, article, batch, quantity, order and release.
- Source
- Dryblend silo
- Target
- Extruder
- Article
- Granulate G-7
- Batch
- MC-2211
- Quantity
- 1,500 kg / 2,000 kg
- Order
- G-3310
- Release
- Shortfall
- Mixer → powder baggingFinished article 25 kg bag of powder
Which released quantity belongs to the powder order and how many bags were actually filled?
- Mixer → dryblend siloIntermediate dryblend with article and batch reference
How much is in the silo, how much is reserved and for which orders is the rest available?
- Mixer → extruder → granulate baggingFinished article 25 kg bag of granulate
Which extruder can make this article and when must the mix be ready there?
The bottleneck Sample data
- In the dryblend silo
- 4,000 kg
- Reserved for powder order
- 2,500 kg
- Demand at extruder inlet
- 2,000 kg
- Freely available
- 1,500 kg
- Missing for granulate
- 500 kg
The granulate actually produced is recorded later at the extruder outlet.
AI models for industry
The stock calculation shows what is missing. Production management needs to know which solution actually works in the plant.
- Dryblend siloHow much material is missing?
Stock and reservation logic calculates the missing 500 kg. The digital twin links the result to the batch, the silo and both orders.
- Mixer → extruderWhen could the next mix reach the extruder?
A forecasting model estimates a time window from comparable batches, actual mixing times and current plant occupancy – with its data basis visible.
- Production managementWhich sequence makes sense for the plant?
A planning model compares permitted options, such as an extra batch or postponing the extrusion order, showing the impact on powder, granulate and bagging.
- Transport routeWhy is this transport route an option?
A language model unlocks released engineering and operating knowledge, e.g. which cleaning is required after the last conveyed raw material, and points to the instruction.
Agent Designer – the next stage of OPDPRO.CARE In development
Which decision should your agent prepare – and who is responsible for it?
The value stream shows how material flows through the plant. The role view shows who may decide and act where. In the Agent Designer we want to bring both together: a company defines which event activates an agent, which data and models it uses, whom it involves and which action needs approval.
Agent's task
The silo agent detects the shortfall and reports the missing 500 kg to production planning with batch, reservations and affected orders.
Responsibility in the plant
Production planning receives a concrete planning task.
Through to the actual material handover
After approval the operator sees at the mixer which follow-up order he is producing for. Once the handover is confirmed, the actual quantity becomes visible at the target. Production planning sees whether the demand is covered, production management whether the material reached the extruder in time. This makes it traceable who decided on what basis and what the decision achieved in the plant.
At which transition in your plant do several people currently have to talk and reconcile Excel sheets before a decision can be made?
Build future-proof agents for production and organisation with us and the Designer.
Discuss your own value stream